1. Which of the following statements about MPS practices are false? a. Backward loading refers to...

Question:

1. Which of the following statements about MPS practices are false?

  • a. Backward loading refers to the practice of allocating capacity to an order working from its due date back towards the present time.
  • b. A "level" MPS attempts to utilize varying employment levels (or possibly employment utilization rates) to absorb fluctuations in demand.
  • c. A "chase" or "matching" MPS attempts to equalize production and demand rates in each production planning period.
  • d. Forward loading refers to the practice of allocating capacity to an order working from the present time into the future given lead time requirements.
  • e. The two broad objectives of an MPS are to meet demand and to minimize costs.

2. The execution cycle consists of various activities. Which of the following is not an activity in the execution cycle?

  • a. distribution
  • b. purchasing (procurement)
  • c. postponement
  • d. fabrication
  • e. assembly

Master Production Schedule:

An effective plan which made company development, which includes staffing, production, and many more are known as mater production schedule. In this plan, They target in which the quality of the item should be achieved in the given time is called the Master Production Schedule. The planning of material requirements is the main function of MPS.

Answer and Explanation:

Choose the correct answer:

1. The correct answer is A "chase" or "matching" MPS attempts to equalize production and demand rates in each production planning period

Explanation: This statement is false because the chase strategy used to arrange the rates of the output so that the planning scope could be matched with the demand. By overtime, hires and many more the chase strategy can be accomplished.

2. The correct answer is c. postponement

Explanation: The execution cycle steps are:

? Purchasing

? Assembly

? Fabrication

? Distribution

Thus postponement is not part of the execution cycle.


Learn more about this topic:

Loading...
Master Production Schedule: Creation, Use & Outputs

from

Chapter 17 / Lesson 2
4.7K

A master production schedule is used by businesses to plan for items that are needed for production. Review the master production schedule, examine how to create it, understand its outputs, and learn how to use it.


Related to this Question

Explore our homework questions and answers library